YR Control Valve Stem Packing PM-TI
YR Control Valve Stem Packing PM-TI
Operator
YR Control Valve Stem Packing PM-TI
YR Control Valve Stem Packing PM-TI
Procedure Title-
Procedure Title-
YR Control Valve Stem Packing PM-TI
YR Control Valve Stem Packing PM-TI
---------------------------------------------------------
---------------------------------------------------------
Purpose-
Purpose-
The purpose of this PM is to adjust or replace any leaking facility control valve stem packing to prolong valve sealing integrity and eliminate stem packing leaks/fugitive emissions.
The purpose of this PM is to adjust or replace any leaking facility control valve stem packing to prolong valve sealing integrity and eliminate stem packing leaks/fugitive emissions.
---------------------------------------------------------
---------------------------------------------------------
Scope-
Scope-
This maintenance activity includes all facility control valves with stem packing.
This maintenance activity includes all facility control valves with stem packing.
---------------------------------------------------------
---------------------------------------------------------
Classification Data-
Classification Data-
Issue Date 06/26/2013
Issue Date 06/26/2013
Document Custodian David Lemonier
Document Custodian David Lemonier
Document Owner Mike Smith
Document Owner Mike Smith
Location-
Location-
Attribute Value
Attribute Value
Facility Type- Fixed Leg Platform
Facility Type- Fixed Leg Platform
Facility- WD143
Facility- WD143
Equipment System- Control Valve
Equipment System- Control Valve
SAP Task List Group- USVACV_W
SAP Task List Group- USVACV_W
SAP Task Group Counter- 57
SAP Task Group Counter- 57
Plans & Permits-
Plans & Permits-
Issue Response
Issue Response
JSA Required- Yes
JSA Required- Yes
Safe Work Permit Required- No
Safe Work Permit Required- No
Safe Work Plan Required- No
Safe Work Plan Required- No
LO/TO Required- No
LO/TO Required- No
Hot Work Permit Required- No
Hot Work Permit Required- No
Fall Rescue Plan Required- No
Fall Rescue Plan Required- No
Isolated Work Allowed- Yes
Isolated Work Allowed- Yes
Confined Space Entry Required- No
Confined Space Entry Required- No
Leadership Walkthrough Required- No
Leadership Walkthrough Required- No
RAM Rating-
RAM Rating-
Issue Response
Issue Response
RAM Severity & Likelihood- C1
RAM Severity & Likelihood- C1
RAM Rating- Low
RAM Rating- Low
Tools- Hand tools, snoop
Tools- Hand tools, snoop
Consumables and Spare Parts- control valve stem packing material, snoop
Consumables and Spare Parts- control valve stem packing material, snoop
NEW-PAGE
NEW-PAGE
YR Control Valve Stem Packing PM-TI
YR Control Valve Stem Packing PM-TI
Task Summary:
Task Summary:
1. Inform production operations of the planned work area of facility where control valves are to have stem packing inspected.
1. Inform production operations of the planned work area of facility where control valves are to have stem packing inspected.
2. For each control valve stem packing being inspected, spray snoop to stem packing sealing area to determine if any leaking is occurring. Some very minor leaking (fugitive emissions magnitude) may be occurring, which is not unusual.
2. For each control valve stem packing being inspected, spray snoop to stem packing sealing area to determine if any leaking is occurring. Some very minor leaking (fugitive emissions magnitude) may be occurring, which is not unusual.
3. If any leaking is occurring, follow control valve manufacturer’s instructions and local facility procedures for adjusting the stem packing. Under no circumstances can the valve gland be opened without a specific work permit to break containment.
3. If any leaking is occurring, follow control valve manufacturer’s instructions and local facility procedures for adjusting the stem packing. Under no circumstances can the valve gland be opened without a specific work permit to break containment.
4. Re-check with snoop to verify that the adjustment was effective in reducing/eliminating the fugitive emission magnitude leak.
4. Re-check with snoop to verify that the adjustment was effective in reducing/eliminating the fugitive emission magnitude leak.
5. Note any grease fittings/body cavity bleeds that are not SS, exhibit significant corrosion or are in otherwise poor condition.
5. Note any grease fittings/body cavity bleeds that are not SS, exhibit significant corrosion or are in otherwise poor condition.
6. When control valve stem packing inspection of all valves within the planned work area has been completed, notify production operations that the task has been completed.
6. When control valve stem packing inspection of all valves within the planned work area has been completed, notify production operations that the task has been completed.
7. Repeat steps 1-6 until all facility control valves’ stem packing have been inspected.
7. Repeat steps 1-6 until all facility control valves’ stem packing have been inspected.
8. Enter Notification for any facility control valves that are not in good physical condition, continue to leak after adjustment or for the replacement of any CS grease fittings/body cavity bleeds with SS.
8. Enter Notification for any facility control valves that are not in good physical condition, continue to leak after adjustment or for the replacement of any CS grease fittings/body cavity bleeds with SS.
9. Close-out job. Charge time and confirm work completion in SAP. Document history in the Notification attached to this Order via M3 Activity Report.